Securing high-end care with advanced energy solutions
Cali, Colombia: Ranked among the top clinics in Latin-America contintent, and winning "The National Hospital" award in 2012, Imbanaco clinic continuously strives to advance top-rate care for its patients as well as facilitating medical research.
In its aim to become a reference for advanced medical and technological development, Imbanaco sought to extend this to all materials and systems installed to guarantee safety for patients and the equipment securing their care.
Importantly, that relates to the hospital’s energy infrastructure - particularly the indoor cooling and chilled water systems. After careful design and planning together with Thermaflex in 2011, the project could be finalized by 2013 within 1 year for the connection and insulation of the water chillers and indoor chilled water distribution.
Results
STATISTICS
• 2,820 kW of refrigeration cooling
• 60 rooms to cool
• 1 year of project length
• In Top 14 Latin American clinics
The design, development and installation of the cooling and chilled water system was realized flawlessly. The flexible pre-insulated Flexalen piping system made from Polybutene proved ideal in securing the chilled water supply for the hospital at minimal hassle, and maximum performance. The condensation challenge for cooling system could be perfectly met with ThermaSmart PRO, as its integrated water-tight barrier completely eliminates any risk of condensation, ensuring the safety and lifetime of the system. After the finalization of the project, Imbanaco ranked among the top 14 clinics on the Latin-American continent in 2013.
Organisation:
Centro Medico Imbanaco
. . . . . . . . .